Quality Material Testing & Inspection - Certified 8(a), WOSB, EDWOSB & Utah DBE
Here's a few of the amazing projects we've been a part of...
The Payson Sewer Plant project consisted of building a new expansion to the existing facility. Cripple Creek provides material testing and special inspections.
The Vineyard Water Treatment Plant project involved the construction of new facilities at the existing plant. Cripple Creek provides material testing and special inspections.
The Provo River Water Treatment Plant project consisted of constructing a new water treatment plant in Provo city. Provo City is constructing a 30 MGD Water Treatment Plant as part of their ASR project. The project includes a WTP Facility with membrane treatment, a 2 MG Clearwell, a High Service Pump Station, and 36-inch diameter transmission pipeline. Cripple Creek provides material testing and special inspections.
The Powder Mountain project involved the construction of new lift stations and facilities at the resort. Cripple Creek provides Storm Water protection installation and inspections.
The Natural Bridges National Monument project was for new pavement on roads and trails. Cripple Creek provided Quality Control testing/inspections and Storm Water protection installation and inspections.
The Lehi UTA Pedestrian Bridge Repair project involved the removal settled base and damaged pavement on the South side ramp and rebuilding of the subgrade, base, and HMA pavement while maintaining existing bridge deck. Cripple Creek performed materials testing and SWPPP inspections.
The Salt Lake City Airport Taxiway F project rebuilt the taxiway from the subgrade up to lean concrete subbase and PCCP lanes with HMA shoulders. Cripple Creek performed Quality Control on the project including oversight, inspection, and materials testing. This project received the 2024 AGC Airport/Transit Project of the Year award.
The Salt Lake City Airport Demo Row 21 project consisted of demolishing existing hangar structures and rebuilding the subgrade, base, asphalt pavement and utilities. Cripple Creek performed Quality Control on the project through oversight, inspection, and materials testing.
The Orem Tertiary project consisted of updating the existing Orem water treatment facility with new structures. Cripple Creek provided materials testing and special inspections.
The Deer Creek Intake project updated the existing dam structure with new intake technology while maintaining the water level in the reservoir by working underwater using divers, barges, and more. The dry side of the dam required the installation of a soil nail wall. Cripple Creek provided materials testing and special inspections.
The Tiger Grant funding is being used for hundreds of projects designed to make it safer and easier to walk or bike to UTA public transit systems. Cripple Creek is the Quality Control Program Manager and also provides environmental, material and special inspections.
The WATRR project includes the construction of a new wastewater treatment facility for Provo City. Cripple Creek provides the project with material testing and special inspections.
The US89 project consists of widening US89 to three lanes in each direction, the addition of four interchanges and two at-grade crossings. Received multiple awards.
Cripple Creek provided quality control support and environmental services.
Cripple Creek has provided many services for Chevron and their contractors . Some of the projects include: Greenfield, Brownfield, Alky Retrofit, Reformer Substation, Tanko Tanks, Analyzer Platform and Oasis.
Throughout the state of Utah, Cripple Creek is responsible for the asbestos inspections, Storm Water Plans and inspections on DOT owned properties.
A brand new Pozzolan plant built from the ground up with Cripple Creek to support in all quality control testing and special inspections, environmental inspections during construction and MSGP setup.
This project was UDOT’s first 3D project for structure design. It replaced three bridges: two on I-80 over UPRR tracks and I-80 at the SR-36 interchange. Cripple Creek provided SWPPP Inspections, Dewatering Services, Quality Control Support and Polyester Overlay Testing.
SLC Airport Taxiway F
ASSOCIATED GENERAL CONTRACTORS OF AMERICA
US89; I84 to Farmington Reconstruction ASSOCIATED GENERAL CONTRACTORS OF AMERICA
US89; I84 to Farmington Reconstruction ASSOCIATED GENERAL CONTRACTORS OF AMERICA
US89; I84 to Farmington Reconstruction
ROADS & BRIDGES
US89; I84 to Farmington Reconstruction ASSOCIATED GENERAL CONTRACTORS OF AMERICA
US89; I84 to Farmington Reconstruction UTAH DEPARTMENT OF TRANSPORTATION
US89; I84 to Farmington Reconstruction UTAH DEPARTMENT OF TRANSPORTATION
US89; I84 to Farmington Reconstruction
UTAH DEPARTMENT OF TRANSPORTATION
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.